English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  Items with full text/Total items : 109953/140892 (78%)
Visitors : 46227477      Online Users : 584
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://nccur.lib.nccu.edu.tw/handle/140.119/132132


    Title: 國立政治大學Alma圖書館服務平台導入實務之經驗分享
    An Experience Sharing of Alma Implementation in National Chengchi University Libraries
    Authors: 陳靜宜
    Chen, Ching-Yi
    張琇婷
    Chang, Hsiu-Ting
    Contributors: 圖資與檔案學刊
    Keywords: 系統轉置 ; 圖書館服務平台 ; 雲端圖書館自動化系統 ; 大學圖書館 ; System migration ; Library service platform ; Cloud-based ILS ; Academic library
    Date: 2020-06
    Issue Date: 2020-10-07 11:56:12 (UTC+8)
    Abstract: 隨著圖書館需求與資訊環境發展的複雜變化,越來越多圖書館迫切欲汰換傳統圖書館自動化系統轉置到新一代的圖書館服務平台。然而,圖書館自動化系統轉置是個複雜龐大的工程,各圖書館的館藏規模、任務、人力資源、服務對象與機構的網路環境建設皆有所不同,但規劃系統轉置作業的基本原則與策略,應相去不遠。本文主旨為揭示國立政治大學圖書館從Millennium轉換自動化系統至雲端圖書館服務平台Alma的實作經歷與問題分享,以時序論述本館在系統轉置前、測轉與正式轉置等三階段的重要工作項目、輔助工具、注意事項、遭遇的問題、與因應策略或未來建議等,期可供欲進行雲端圖書館服務平台轉置作業之圖書館同道參考。
    As libraries` needs and information services complicatedly evolve, more and more libraries are eager to migrate from traditional Integrated Library Systems (ILS) to the next generation of Library Services Platforms. Based on the differences of library`s collection size, service objects, human resource, patrons and technology infrastructure, the library management system migration process would be a huge and complex project. Even though each migration process comes with challenges that are unique to the library and systems involved, there are still some general guidelines and strategies shared. This paper is a report of National Chengchi University Libraries` experiences for migrating from Innovative Interfaces, Inc.`s Millennium to Ex Libris` Alma. Three stages of migration process (pre-migration, test migration, and cutover) were introduced in chronological order. In conclusion, we discussed the main tasks, key events, migration tools, problems, strategies and suggestions, etc. These lessons and experiences will be recommended as references for those libraries planning to carry out cloud-base library service platform migration.
    Relation: 圖資與檔案學刊, 96, 171-194
    Data Type: article
    DOI 連結: https://doi.org/10.6575/JILA.202006_(96).0005
    DOI: 10.6575/JILA.202006_(96).0005
    Appears in Collections:[圖資與檔案學刊] 期刊論文

    Files in This Item:

    File Description SizeFormat
    149.pdf613KbAdobe PDF2229View/Open


    All items in 政大典藏 are protected by copyright, with all rights reserved.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback