English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  Items with full text/Total items : 109952/140887 (78%)
Visitors : 46343840      Online Users : 950
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    政大機構典藏 > 商學院 > 統計學系 > 期刊論文 >  Item 140.119/140180
    Please use this identifier to cite or link to this item: https://nccur.lib.nccu.edu.tw/handle/140.119/140180


    Title: A two-phase preventive maintenance policy considering imperfect repair and postponed replacement
    Authors: 楊素芬
    Yang, Su-Fen
    Yang, Li;Ye, Zhi-sheng;Lee, Chi-Guhn;Peng, Rui
    Contributors: 統計系
    Keywords: Maintenance;Delay time;Imperfect repair;Postponed replacement;Performance-based contract
    Date: 2019-05
    Issue Date: 2022-05-30 16:03:11 (UTC+8)
    Abstract: This paper investigates a novel two-phase preventive maintenance policy for a single-component system with an objective of maximizing the revenue generated by the performance-based contracting (PBC). The system undergoes a defective state before failure, and produces signal hinting the condition. The maintenance policy consists of two phases: imperfect maintenance phase followed by postponed replacement phase. In the imperfect maintenance phase, inspection is performed to reveal the defective state, leading to a possible repair. Both the inspection and the repair are imperfect. In the postponed replacement phase, preventive replacement is performed during the upcoming scheduled maintenance window, before which no inspection or repair is executed. The expected net revenue under PBC is maximized via the joint optimization of the inspection interval, number of inspection and preventive replacement interval. We apply the model to a case from a steel converter plant, and the results show that our proposed maintenance policy outperforms some existing maintenance policies in terms of the net revenue.
    Relation: European journal of Operational Research, 274(3), 966-977
    Data Type: article
    DOI 連結: https://doi.org/10.1016/j.ejor.2018.10.049
    DOI: 10.1016/j.ejor.2018.10.049
    Appears in Collections:[統計學系] 期刊論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML2160View/Open


    All items in 政大典藏 are protected by copyright, with all rights reserved.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback