政大機構典藏-National Chengchi University Institutional Repository(NCCUR):Item 140.119/61599
English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  Items with full text/Total items : 109952/140887 (78%)
Visitors : 46338918      Online Users : 1163
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://nccur.lib.nccu.edu.tw/handle/140.119/61599


    Title: Variable control scheme in the cascade processes
    Authors: 楊素芬
    Yang, Su-Fen
    Contributors: 統計系
    Keywords: Control charts;Cascade processes;Markov chain
    Date: 2010-01
    Issue Date: 2013-11-11 17:44:29 (UTC+8)
    Abstract: The article considers the variables process control scheme for cascade processes. We construct variable sample sizes and sampling intervals (VSSI) control charts to effectively monitor the input variable and the output variable produced by a cascade process. The performance of the proposed VSSI control charts is measured by the adjusted average time to signal derived by a Markov chain approach. An example of the metallic film thickness of the computer connectors system shows the application and the performance of the proposed VSSI control charts in detecting shifts in means of the cascade process. Furthermore, the performance of the proposed VSSI control charts and the fixed sample sizes and sampling intervals control charts are compared by numerical analysis results. These demonstrate that the former is much faster in detecting small and medium shifts. The optimum VSSI control charts are also proposed using optimization technique when quality engineers cannot specify the values of the variable sample sizes and sampling intervals. It has been found that the optimum VSSI control charts work and are thus suggested whenever quality engineers cannot specify the values of variable sample sizes and sampling intervals. Furthermore, the impacts of misusing Shewhart charts to monitoring the process means on the cascade process are also investigated.
    Relation: Expert systems with applications, 37(1) , 787-798
    Data Type: article
    DOI link: http://dx.doi.org/10.1016/j.eswa.2009.05.095
    DOI: 10.1016/j.eswa.2009.05.095
    Appears in Collections:[Department of Statistics] Periodical Articles

    Files in This Item:

    File Description SizeFormat
    787798.pdf600KbAdobe PDF21018View/Open


    All items in 政大典藏 are protected by copyright, with all rights reserved.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback