English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  Items with full text/Total items : 110052/141001 (78%)
Visitors : 46384559      Online Users : 1341
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://nccur.lib.nccu.edu.tw/handle/140.119/51228


    Title: 論台灣地區已完工公共工程的保險機制
    A study on the insurance mechanism for the civil engineering completed works in Taiwan
    Authors: 陳俊豪
    Chen, C.H.
    Contributors: 蔡政憲
    Tsai, Cheng Hsien
    陳俊豪
    Chen, C.H.
    Keywords: 公共工程
    天然災害
    完工土木工程保險
    Public Construction Works
    Natural Disaster
    Civil Engineering Completed Risks Insurance
    CECR
    Date: 2010
    Issue Date: 2011-10-05 14:33:47 (UTC+8)
    Abstract: 公共工程是國家重要施政項目之ㄧ,所提供的服務品質關係著國家經濟發展甚鉅。台灣地處亞熱帶及環太平洋地震帶,颱風、洪水、地震發生頻繁,公共工程的服務品質受天然災害的威脅甚大。近年來天災頻仍,面對天然災害所帶來的經濟損失,有許多國家已經開始透過保險方式,處理已完工公共工程遭受天然災害威脅時的財務風險,以減輕國家財政負擔,進而更合理的分配國家資源。
    本研究將透過台灣地區天然災害發生的情形及我國目前在公共工程遭遇天然災害而毀損時的因應方式探討天然災害損失對我國財政的負擔;並介紹國際上主要再保險公司:瑞士再保險公司、慕尼黑再保險公司有關完工土木工程保險的承保範圍、核保方式,與東亞日本、南亞印度兩個國家經營完工土木工程保險的現況。
    本研究並整理歸納透過商業保險來進行已完工公共工程的天災風險規劃雖較現行單以國庫承擔損失方式經濟,但可能面臨政府機關態度消極及產險業者承保能量不足兩個關鍵議題。惟以澳洲昆士蘭水患為例,慮及不可知的天災風險,仍建議政府機關能率同商業保險業者共同建立完整的已完工公共工程風險管理機制,攜手降低天災風險發生時可能帶來的傷害。
    關鍵字:公共工程、天然災害、完工土木工程保險。
    Public Construction Works are always considered as one of the important national economic developing strategy. In view of Taiwan is located in the region which is highly exposed to natural disasters such as typhoon, flood and earthquake, the quality of the after service related to the Civil Engineering Completed Works is greatly threatened by the natural disasters. In recent years, there were many natural disasters occurred, in order to minimize the economic loss brought by such disasters, many countries have begun to arrange insurance placement for the Civil Engineering Completed Works to share the financial risks.
    This study introduces the loss circumstances of the public engineering works brought by the natural disaster and the impact of the economic growth in Taiwan. The major international re-insurers: Swiss Re and Munich Re both provide the Civil Engineering Completed Risks (CECR) Insurance to against the loss or damage after the construction work has been completed. This study introduces the difference coverage and underwriting as compared in between Swiss Re Form and Munich Re Form. This study also illustrates the current status in respect of CECR in Japan and India markets.
    This research induces a more economic method by arranging the Catastrophe Risks Plan through the placement by commercial insurance for the Civil Engineering Completed Works rather than the existing regulations that all these disasters bond by the government. Moreover, it also facing two problems are that the government is too conservative and the negative attitude as well as the in-sufficient capacity of the local insurance industry. For example, the serious flooding occurred in Queensland- Australia, the government should take into consideration how to prevent from the incredible natural disaster risks. We do suggest the government should corporate with local insurance industry to establish an completed risks management for Civil Engineering Completed Works to minimize the loss that brought by the natural disasters which may occur.

    Key Words: Public Construction Works, Natural Disaster, Civil Engineering Completed Risks Insurance (CECR)
    Reference: 1. Emergency Events Database(EM-DAT) website (http://www.emdat.be),AD2010。
    2. Japan Meteorological Agency website (http://www.jma.go.jp),AD2010。
    3. Swiss Re website(http://www.swissre.com),AD2011。
    4. Munich Re website(http://www.munichre.com),AD2011。
    5. 「Munich Re NATHAN Online system 2010」,Munich Re,AD2010。
    6. 「Natural Disaster Hotspots–A Global Risk Analysis」,The World Bank,AD2005。
    7. 「The Natural Disasters Risk Index 2010」,Maplecroft,AD2010。
    8. The New India Assurance Co., Ltd.,「INDIA 2010」, The International Association of Engineering Insurers (http://www.imia.com),AD2010。
    9. United States Geological Survey website (http://www.usgs.gov),AD2010。
    10. 內田傑、平田輝滿、松野由希、尹 鍾進、末吉徹也,「交通施設の災害復旧に対するリスクファイナンスと公的負担制度に関する現状と課題(有關交通設施災害復舊的金融風險和公共負擔制度的現狀及課題)」,日本運輸政策研究所第25回研究報告會,AD2009。
    11. 「工程保險核保手冊」,財團法人工程保險協進會,2009年。
    12. 「工程保險-財產保險業務員基本教育訓練教材」,中華民國 產物保險商業同業公會,2006年修訂版。
    13. 「工程保險賠款率統計表(按風險類別、承保範圍)-意外事故年度制」,財團法人保險事業發展中心,2009年。
    14. 林昀靜、盧孟明,「近五十年極端降雨之分析」,中央氣象局科技中心,2010年。
    15. 吳及揚,「天災風險管理」簡報講義,2010年版。
    16. 吳宜昭、陳永明、朱容練,「台灣氣候變遷趨勢」,國家災害防救科技中心,2010年。
    17. 延允中,「橋樑維護管理機制、成效查核與經費編列探討-以公路總局為例」論文,2004年。
    18. 「財團法人工程保險協進會手冊」,財團法人工程保險協進 會,2006年。
    19. 「國際工程風險管理與保險」,淑馨出版社,1999年。
    20. 陳繼堯,「工程保險理論與實務」,智勝文化事業有限公司,2002年。
    21. 郭斯傑、杜辰生、荷世平、魏衍,「建立公共建設工程保險機制之研究」,行政院公共工程委員會,2002年。
    22. 「莫拉克颱風之災情勘查與分析」,國家災害防救科技中心,2010年。
    23. 公共政策論壇,「天災風險對政府財政之衝擊與對策」,國立政治大學,2010年。
    24. 行政院主計處全球資訊網(http://www.dgbas.gov.tw),2011年。
    25. 審計部全球資訊網(http://www.audit.gov.tw),2011年。
    26. 財政部國庫署全球資訊網(http://www.nta.gov.tw),2011年。
    27. 行政院經濟建設委員會全球資訊網(http://www.cepd.gov.tw),2011年。
    28. 公共工程委員會全球資訊網(http://www.pcc.gov.tw),2011年。
    29. 交通部公路總局全球資訊網(http://www.thb.gov.tw),2011年。
    30. 中央氣象局全球資訊網(http://www.cwb.gov.tw),2011年。
    31. 內政部消防署全球資訊網天然災害統計(http://www.nfa.gov.tw/Show.aspx?MID=1024&UID=1029&PID=1024),2011年。
    32. 雅虎奇摩新聞網,「2010年度十大新聞」 (http://tw.yearinreview.yahoo.com/2010/tw_news),2011年。
    33. 經濟日報新聞網,「隨天災而來的財政土石流」 (http://edn.gmg.tw),2010年。
    Description: 碩士
    國立政治大學
    經營管理碩士學程(EMBA)
    97932237
    99
    Source URI: http://thesis.lib.nccu.edu.tw/record/#G0097932237
    Data Type: thesis
    Appears in Collections:[經營管理碩士學程EMBA] 學位論文

    Files in This Item:

    File SizeFormat
    223701.pdf3589KbAdobe PDF22219View/Open


    All items in 政大典藏 are protected by copyright, with all rights reserved.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback