English  |  正體中文  |  简体中文  |  Post-Print筆數 : 27 |  Items with full text/Total items : 109951/140887 (78%)
Visitors : 46278274      Online Users : 1573
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://nccur.lib.nccu.edu.tw/handle/140.119/63805


    Title: 採用爭議審議機制及早預防與解決工程履約爭議之研究
    Other Titles: A Study of Dispute Boards for the Timely Prevention and Resolution of Construction Disputes
    Authors: 顏玉明
    Contributors: 法科所
    Keywords: 履約爭議;替代性紛爭解決機制;建議;裁決;爭議審議機制;爭議審查委員會;爭議裁決委員會;國際商會;國際諮詢工程師聯合會
    Dispute;Alternative Dispute esolution/ADR;Recommendation;Adjudication;Dispute Board/DB;Dispute Review Board/DRB;Dispute Adjudication Board/DAB;International Commercial Chamber/ICC;Federation Internationale des Ingenieures-Conseils/FIDIC
    Date: 2012.10
    Issue Date: 2014-02-11 17:29:49 (UTC+8)
    Abstract: 本文介紹國際間爭議審議機制之產生背景,及其運用於及早預防及解決工程履約爭議之狀況;同時藉由比較國際間類似之機制與其運作模式,深入瞭解其特性及相關規範,並參考國際間及中港臺近年來運作現況與趨勢,提出我國可行之修法建議,期能利用爭議審議機制即時、專業、迅速之優點,及早預防工程履約爭議之發生,強化替代性紛爭解決機制應用於工程履約爭議處理之功能,以協助工程履約之順利推動,並達分流訴訟壓力與即時控制爭議之功效。
    This paper aims to introduce the background of Dispute Boards in a worldwide context, and their application in the timely prevention and resolution of construction disputes. It also explores the characteristics and regulations of similar mechanisms by comparing various practices. At the end of this paper, the practices, trends and the pros in global and in Mainland China, Hong Kong and Taiwan are pointed out for reference of domestic usage as suggestions for amending regulations. It is hoped the advantages of the Dispute Board, that is the timely, professional and prompt management of conflict, will help to prevent the formation of disputes and to strengthen the functions of ADR in construction dispute resolution. Also it is hoped be beneficial to smooth the progress of construction projects, to minimize loads in the litigation system, and to foster the timely management of disputes.
    Relation: 政大法學評論, 129, 1-73
    Data Type: article
    Appears in Collections:[法律科際整合研究所] 期刊論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML21178View/Open


    All items in 政大典藏 are protected by copyright, with all rights reserved.


    社群 sharing

    著作權政策宣告 Copyright Announcement
    1.本網站之數位內容為國立政治大學所收錄之機構典藏,無償提供學術研究與公眾教育等公益性使用,惟仍請適度,合理使用本網站之內容,以尊重著作權人之權益。商業上之利用,則請先取得著作權人之授權。
    The digital content of this website is part of National Chengchi University Institutional Repository. It provides free access to academic research and public education for non-commercial use. Please utilize it in a proper and reasonable manner and respect the rights of copyright owners. For commercial use, please obtain authorization from the copyright owner in advance.

    2.本網站之製作,已盡力防止侵害著作權人之權益,如仍發現本網站之數位內容有侵害著作權人權益情事者,請權利人通知本網站維護人員(nccur@nccu.edu.tw),維護人員將立即採取移除該數位著作等補救措施。
    NCCU Institutional Repository is made to protect the interests of copyright owners. If you believe that any material on the website infringes copyright, please contact our staff(nccur@nccu.edu.tw). We will remove the work from the repository and investigate your claim.
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback